Overview
Alerts
3-Week Look Ahead
Site Logistics
Progress Photos
Contacts
Project Team
Site Logistics |:


View Site Plan

Parking Information

The entire west side of the lot, this includes the H/C spaces, service spaces, and three metered spaces will be taken over as part of the construction zone.

The accessible spaces and service spaces will be moved to a different part of the lot as follows:

  • The three metered spaces on the south side will be converted to Accessible spaces.
  • 4 metered spaces on the east side (Ham Smith side) will be converted to 2 service spaces and one van accessible space.

There will be NO impact on parking in the middle row, this will continued to be reserved on a daily basis as it currently is.

There will be 8 metered spaces remaining for general use on the east side of the lot (Ham Smith side). From time to time, depending on the number of reservations, these spaces may be reserved, thereby, further limiting the number of general use spaces.